R Kiran Constructions LLP

R Kiran & VPSTEC

Civil, PEB, MEP, fire, HVAC, chillers, data centres and interiors — delivered together, on one contract.

R Kiran Constructions

In partnership with

VPSTEC Projects

The whole building, one contract

R Kiran Constructions and VPSTEC Projects have joined up to take a project from foundations to commissioning. R Kiran builds the structure; VPSTEC installs the services that run inside it, and delivers pre-engineered buildings through its sister company. R Kiran then finishes the interiors people work in.

An owner signs one contract for civil, PEB, MEP, fire protection, HVAC, chillers, plant utilities and interiors — instead of tendering each trade separately and managing the gaps between them.

R Kiran Constructions

Civil · Structure · Interiors

Civil turnkey contractor since 2007: 50+ projects and 30,00,000+ sq ft delivered, with a workforce of 1,500+, an owned batching plant and an in-house QC laboratory. Interior fit-out is delivered in-house.

VPSTEC Projects

MEP · PEB · Fire · HVAC

A Pune engineering group with 25+ years in industrial MEP: electrical, fire, HVAC, chillers, piping, pollution control and water treatment, with PEB through its sister company and OEM partners in Japan, Germany, China and Taiwan.

Steel roof frame erected over the RCC walls of an industrial shed — Indocount, Kagal MIDC, an R Kiran project
Fire pump room installed by VPSTEC
Cooling tower installed by VPSTEC
50+
R Kiran projects completed
24+
major VPSTEC projects
25+
years of MEP experience
13
disciplines on one contract

How the contract runs

From foundations to commissioning

  1. 01

    Civil & structure

    R Kiran

    Pedestals, floor slab, plinth walls and the RCC frame of the office block, cast with concrete from our own batching plant.

Cooling towers installed by VPSTEC

What the contract covers

Take the full scope, or any part of it. Every discipline below is available under the same agreement.

  1. RCC frame in progress on an R Kiran industrial project
    01

    Civil & structure

    • Foundations and RCC frame
    • Industrial floors and trimix
    • Roads, drainage and external works
    • Owned batching plant and QC laboratory
  2. Steel roof frame over an industrial shed
    02

    Pre-engineered buildings

    • PEB sheds and warehouses
    • Roofing and cladding
    • Mezzanines and crane-bay structures
    • Delivered through VPSTEC's sister company
  3. Row of LT panels installed by VPSTEC
    03

    Electrical infrastructure

    • Transformers, LT panels and bus ducts
    • Cable laying, earthing and lightning protection
    • DG sets and electrical commissioning
  4. Fire pump room with main, jockey and standby pumps
    04

    Fire protection

    • Hydrant and sprinkler systems
    • Fire alarm and detection
    • Fire pump rooms — main, jockey and standby
  5. Ventilation units and ducting along a factory wall
    05

    HVAC & ventilation

    • Industrial ventilation and fresh air
    • Air handling and ducting
    • Heat exchanger integration
  6. Six-cell cooling tower installed by VPSTEC
    06

    Chillers & cooling

    • Chillers and chilled water systems
    • Cooling towers
    • Process cooling
  7. Power distribution panels
    07

    Data centre infrastructure

    • Critical cooling and HVAC
    • Critical electrical and fire protection
    • Testing and commissioning
  8. Dust collector with ducting and emission stack
    08

    Pollution control

    • Dust collectors and wet scrubbers
    • Fume and acid-mist extraction
    • Emission stacks, ducting and hoods
  9. Zero liquid discharge plant
    09

    Water treatment

    • Effluent and sewage treatment plants
    • Zero liquid discharge
    • RO plants and water recovery
  10. Gas cylinder bank with automatic manifold
    10

    Piping & industrial gas

    • Process and utility piping — MS, SS, HDPE, GI, PP
    • Compressed air and steam lines
    • LPG and PNG piping to PESO requirements
  11. Roller conveyor line on a factory floor
    11

    Plant utilities & handling

    • Machine installation and alignment
    • Conveyors and material handling
    • Acid-proof, PU and epoxy flooring
  12. Compressor room with air piping
    12

    Energy efficiency

    • VFD and compressed-air optimisation
    • Power factor correction (APFC)
    • Centralised vacuum systems
  13. Welcomhotel Rama International, built by R Kiran with civil and interior scope
    13

    Interiors

    By R Kiran, in-house

    • Office, hotel and commercial fit-out
    • Flooring, partitions and false ceilings
    • Reception, workstations and joinery
    • Finishes coordinated with the MEP services above them

VPSTEC on site

Installations by VPSTEC Projects

  • Single-cell cooling tower
  • Fire pump headers and valves
  • Wet scrubbers and stacks
  • Transformer yard
  • Effluent treatment plant
  • Compressor with compressed-air piping
  • Industrial emission stack
  • RO plant
  • Vertical fire pumps
  • Acid-proof brick flooring
  • Insulated water circulation piping
  • Cooling tower
  • Ultrafiltration module

What we build together

  • Manufacturing plants
  • Warehouses and logistics
  • Data centres
  • Hotels and hospitality
  • Commercial buildings

Why one contract

01
One contract
One agreement, one programme and one point of responsibility, from the first excavation to the last commissioning certificate.
02
No interface gaps
Sleeves, trenches, plinths and shafts are planned with the services they carry, not broken out and patched after the slab is cast.
03
One programme
Civil and MEP crews work to a single schedule, so services start as soon as each area is ready instead of waiting for a separate contractor.

VPSTEC has delivered for

As listed by VPSTEC Projects

  • Volkswagen
  • Godrej & Boyce
  • Tata Green Batteries
  • Gestamp
  • Maxion Wheels
  • BOBST
  • NRB Bearings
  • Kinetic Green
  • Delux Bearings

Planning a plant, a warehouse or a data centre?

Talk to us about the whole of it — structure and services, on one contract.

R Kiran Constructions

In partnership with

VPSTEC Projects