Target Zero, and a pour card for every pour.

Health, safety, environment and quality are run as one system on site. The test records go with the building — an owner should be able to ask what a slab was tested at and get an answer.

01

Health, safety & environment

Through Target Zero we work to perform every activity free of accidents, at all times.
Toolbox talks & training on an R Kiran Constructions site
Toolbox talks & training
Every shift opens with a toolbox talk covering the day's activity and its specific risks. Training is recorded against the worker, not the site.
Health camps on an R Kiran Constructions site
Health camps
On-site health camps and medical checks for all personnel, including subcontracted labour.
Signage in key areas on an R Kiran Constructions site
Signage in key areas
Safety boards and warning signage at every critical zone — edges, lifting areas, live electrical, excavation.
Worker welfare
Motivation and welfare initiatives run alongside the safety programme, because retention and safety move together.
Water & sanitation
Clean drinking water, washing facilities and maintained sanitation on every site.
Organised labour camp on an R Kiran Constructions site
Organised labour camp
Managed accommodation with amenities for migrant workers, kept to a standard an owner can inspect.

02

Quality control

Build trust through quality — on time, every time.
QA/QC plan
Agreed before mobilisation and issued to the site team, so quality is a document people work to rather than a hope.
Work method statements
Each activity has a written method — sequence, plant, labour, controls — approved before it starts.
Dedicated QC laboratory on an R Kiran Constructions site
Dedicated QC laboratory
Cube testing, slump, silt content and compaction run in-house, on our own equipment.
Daily checks on an R Kiran Constructions site
Daily checks
Project and quality engineers inspect daily against hold points. Nothing is poured before its pour card is signed.

Tests run in-house

  • Slump cone test being carried out on site

    Slump cone test

  • Silt content test being carried out on site

    Silt content test

  • Compaction test being carried out on site

    Compaction test

  • Cube testing at 7 and 28 days being carried out on site

    Cube testing at 7 and 28 days

03

Certification

Management system certificates held
StandardSystemCertificate no.
ISO 9001:2015Quality Management SystemUK-02-V-01576
ISO 14001:2015Environmental Management SystemUK-02-V-01577
ISO 45001:2018Occupational Health & Safety Management SystemUK-02-V-01578
  • ISO 9001:2015 certificate, number UK-02-V-01576

    ISO 9001:2015

  • ISO 14001:2015 certificate, number UK-02-V-01577

    ISO 14001:2015

  • ISO 45001:2018 certificate, number UK-02-V-01578

    ISO 45001:2018

Issued by UKAF CERT Limited, London, for construction activities. Valid to October 2028.