R Kiran Constructions LLP

Building across India

We build the places people remember.

What we do best

Expertise in five-star hotels.

50+
projects completed
30,00,000+
sq ft delivered
100%
satisfied brands
1,500+
skilled workforce

Owners and operators we have built for

  • Welcomhotel by ITC Hotels
  • Club Mahindra
  • The Fern
  • Holiday Inn
  • Westin Hotels & Resorts
  • Novex Communications
  • Varroc
  • Sigmarq Technologies
  • Global Group
  • ACG
  • Technocity
  • PV Sons
  • Riddhi Siddhi

Building Excellence in Luxury Hospitality

Specialists in 5-Star Hotel & Premium Commercial Civil Construction

All 26 projects

Swipe to see more

What we do

Our services

Four lines of work, usually in sequence on the same project.

01

Planning

Meticulous planning lays the groundwork: client goals, regulations and buildability reconciled before anyone mobilises. We appraise the site, review the BOQ and rates, fix the programme and slab cycle, write the method statements and coordinate statutory approvals.

02

Design

From concept to detailed drawings, blending what a building has to do with how it has to feel — and what it will take to build. We coordinate the architectural and structural design, prepare shop and working drawings, build the mock-up room for sign-off and check every finish against the brand’s technical standards.

03

Construction

Drawings become structure. Managed to the programme, the pour card and the test record — with our own plant and our own lab. RCC frame, civil and finishing works, external development and MEP coordination, with hold points and cube tests recorded at each stage.

04

Interior

Where the contract extends past the shell: back-of-house, guest rooms and public areas, finished to the operator's standard. Guest-room fit-out, banquet halls, joinery, ceilings and services integration, carried through snagging to handover.

How a project runs

Six stages, and what you hold at the end of each.

  1. 01

    Drawings & BOQ review

    We read the architect's set against buildability and rate the bill of quantities. Owners get our queries before they get a number.

    Priced BOQ, query schedule

  2. 02

    Method & programme

    Structural system, formwork, slab cycle and sequencing are fixed before mobilisation, because a cycle decided on site is a cycle already late.

    Work method statements, programme

  3. 03

    Mobilisation

    Plant, labour camp, site office, batching and testing set up to ISO 45001 practice. On operating hotels, phased to keep the property trading.

    Site establishment, HSE plan

  4. 04

    Structure

    RCC frame to the agreed cycle. Pour cards, cube tests at 7 and 28 days, hold points signed before each pour.

    Cast structure, test records

  5. 05

    Finishes & external works

    Blockwork, waterproofing, façade and external works. Where the contract includes it, interiors to the brand's technical standard.

    Finished shell or fit-out

  6. 06

    Handover

    Snagging, as-builts and the defect liability period. The test records go with the building.

    As-builts, QA/QC dossier

Our own plant, on site.

Full equipment register
  • JCB backhoe loaders and dumpers on site

    Site machinery

    72

    site machines

    Big machinery
    20
    Small machinery
    52
  • Concrete batching plant with a transit mixer

    Concreting

    In-house

    batching plant

  • Slab shuttering laid across a hotel frame

    Formwork

    1,25,000

    sq m shuttering material, own

  • In-house quality control laboratory

    Testing lab

    On-site

    testing lab

Start a project

What are you building?

Send the architect’s drawings and we will come back with a priced BOQ and our queries. A partner replies within one working day.